CHIMALTENANGO
TREATMENT AND SEWERING PLANT
Construction: Edifica Vanguardista
Professionals: Arch. Mario Estuardo Tuyuc Otzoy
Location: Sector La Senda, San José Poaquil
Area: 84 M2 and 334 ML
Execution year: 2018
Photographs: EV
The project located on the outskirts of the municipality, contemplates resolving the need to conduct wastewater and treat it using a prefabricated upflow system. The PVC pipe has been installed as a conduit line, visiting wells and the respective connections.
The property that was set up for the WWTP is next to a winter creek or river. Limits were managed to cover all the houses and then to evacuate the waters to the receiving body.
I mean
The system consists of Pretreatment, Primary and Secondary Digesters, Clarifier, Chlorinator and Sludge Yard.
The project contemplates complementary works such as Retaining Walls, Cantilever and Gabion type, Circulation Wall, Ditches, Heatsinks and Air Passes of conduction pipes, to provide necessary mitigation measures.