CHIMALTENANGO

TREATMENT AND SEWERING PLANT

Construction:      Edifica Vanguardista

Professionals:      Arch. Mario Estuardo Tuyuc Otzoy

Location:             Aldea San Antonio Nejapa, Acatenango

Area:              1300 M2 and 333 ML

Execution year:  2018

Photographs:     EV


 

The project consists of the development of a Treatment Plant for a residential sector with high population density.

 

The chosen terrain with a fairly steep slope, which demands special treatment in the conformation of platforms, with retaining walls and anchor beams for soil stabilization, prior to the construction and installation of the units.

​

The system contemplates a Tertiary Treatment, from Box of Demasías, Channel of Bars (Pre-treatment), Trap of Fats, Bio Pre-manufactured Digestores, Filters Percolators, Secondary Settler (Imhoff), Sludge Yard, Discharge Head.

 

Finally, the Sample Collection Boxes, to verify the efficiency of the system.