CHIMALTENANGO
TREATMENT AND SEWERING PLANT
Construction: Edifica Vanguardista
Professionals: Arch. Mario Estuardo Tuyuc Otzoy
Location: Aldea Pajales II, Acatenango
Area: 1118 M2 and 1090 ML
Execution year: 2018
Photographs: EV
The project consists of the installation of sanitary aqueducts in the main streets of the village, its components; visiting wells, PVC pipe Norma F 949, residential connections.
A fairly large site was available for the construction of the Treatment Plant, the ground conditions were very favorable, with sufficient slope for the operation of the components by gravity.
The construction of the elements of the system, Exceedance Box, Sampling Box, Grating Channel plus Sand Trap, Grease Trap, Imhoff Tank, Sludge Drying Yard, Heatsink and final disposal.
I mean
The project includes the protection of the facilities with a circulation wall and a gate. Complementary works such as pavement walks between the units, railings with HG structure, grass and vegetation sown to consolidate the intervened land.