SOLOLÀ

PAVING CENTER SECTOR

Construction:     Edifica Vanguardista

Professionals:     Arch. Mario Estuardo Tuyuc Otzoy

Location:            Tzununa Village , Santa Cruz la Laguna

Area:                   2100 M2

Execution year:  2012

Photographs:     EV


 

The project consists of the application of rigid pavement on the street
main of the community. An area of ​​1,100 square meters was contemplated, which included the removal of the existing stone, scarification of the sub-base, placement of the base in select compacted material in a minimum thickness of 0.10m, followed by the casting of high-resistance 4000 PSI concrete .

 

It has been completed with elements such as stone masonry (cyclopean) walls, ditches, curbs and signage.

I mean

The stone stamping has been applied at the ideal setting point for all rolling. This initiative of the Castillo Córdova Foundation
to integrate through a texturing of the pavement, the environment, landscape and abundant natural beauty of the site.

I mean