CHIMALTENANGO
MUNICIPAL MARKET IMPROVEMENT
Construction: Edifica Vanguardista
Professionals: Arch. Mario Estuardo Tuyuc Otzoy
Location: San José Poaquil
Area: 675 M2
Execution year: 2019
Photographs: EV
The project consists of the intervention of an existing one-story building and expansion to a second floor. Achieve the integration of both levels to provide a solution to the demand for spaces for commerce.
The project includes a renovation of reinforced slab, circulation with block masonry walls and load elements such as columns and reinforced concrete beams.
The self-supporting curved type roof and in a façade module with a metal structure and die-cut sheet.
I mean
The revitalization of the spaces on both floors has been achieved, a functional building is available, on the inside with an industrial design and on the front with a more institutional design.
I mean